翻訳と辞書
Words near each other
・ Addington County, Ontario
・ Addington Cricket Club
・ Addington F.C.
・ Addington Forks
・ Addington Gardner House
・ Addington High School
・ Addington Highlands
・ Addington Hills
・ Addington Long Barrow
・ Addington ministry
・ Addington Palace
・ Addington Parish, New Brunswick
・ Addington Park
・ Addington Raceway
・ Addington Racing
Addington Railway Workshops
・ Addington School
・ Addington Square
・ Addington v. Texas
・ Addington Vale
・ Addington Venables
・ Addington Village tram stop
・ Addington, Buckinghamshire
・ Addington, California
・ Addington, Cornwall
・ Addington, Kent
・ Addington, London
・ Addington, New Zealand
・ Addington, Oklahoma
・ Addington, Victoria


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Addington Railway Workshops : ウィキペディア英語版
Addington Railway Workshops

The Addington Railway Workshops was a major railway facility established in the Christchurch suburb of Addington in May 1880 by the New Zealand Railways Department. The workshops were previously in Carlyle Street and closed in 1990.
==Description==
Addington Railway Workshops were opened in 1877-8 to overhaul and construct railway equipment, and to assemble locomotives being imported from England. In 1889, the workshops were responsible for building the first locomotive to be built by NZR, W 192 and continued to build locomotives up to the early 1920s. As well as railway work, Addington also undertook contract work such as the manufacture of gold dredge components; during the First World War, the workshops produced military equipment including aeroplane components.
During the 1920s, Addington was re-geared to manufacture and overhaul rolling stock, although it continued to carry out limited overhauls on steam locomotives and the EC and EO class electric locomotives. Limited locomotive construction resumed in 1962 with the construction of the DSC class centre-cab shunting locomotives. Addington also assembled the Mitsubishi DSA and DSB class diesel-hydraulic shunting locomotives in 1967-8 and four of the five Toshiba DSJ class centre-cab shunters in 1984.
Due to the rationalisation of the New Zealand Railways Corporation following deregulation in 1987, Addington Workshops closed on 14 December 1990. The site was cleared with the exception of the former water down; due to changes in freight handling the Main North Line was realigned across the former works entrance, while a new Christchurch Railway Station was opened on this site along the realigned stretch of track on 5 April 1993, replacing the former Christchurch railway station on Moorhouse Avenue in central Christchurch.
The remainder of the site was sold to Ngāi Tahu for redevelopment as a shopping centre, named Tower Junction after the former workshops water tower. The Addington Water Tower is registered with the New Zealand Historic Places Trust as a Category I heritage building, registration number 5390.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Addington Railway Workshops」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.